I Almost Lost $3,200 on a Napoleon Order—Until I Built This 11-Step Checklist

2026-11-03 · Warren Hughes

If you're the person placing Napoleon orders for contractors and dealers, this is for you. Grills, fireplaces, range hood parts—all of it. I've been handling these orders for about six years. For the first three, I made every mistake you could probably think of. The ones I can actually measure cost roughly $12,400 total.

Not every mistake was catastrophic. But they added up to something that made me build a checklist.

Here's what I actually do now. Eleven steps.

1. Verify the model number against the actual install space

Sounds basic. But try pushing a Napoleon Prestige 500 into a space that was described as "about 50 inches" on a job-site sketch. I have. That "about" cost $890 in rework and a one-week delay.

What to do: Pull the exact spec sheet for the model. Run the numbers in your head: does that dimension plus clearance actually fit? If the client says "close enough," go measure it yourself.

2. Check accessory version compatibility—especially range hood parts

Napoleon range hood parts compatibility is where I made my dumbest mistake. In September 2022, I ordered 12 accessory kits for what I assumed was a universal fit. Seven of them didn't match three of the client's models—because those models had gone through two versions.

What to do: Use the Napoleon dealer portal to cross-check part numbers against model versions. Don't rely on product-name searches. When in doubt, take a photo of the client's old part and send it to Napoleon tech support. Five extra minutes saved me $450 that time.

3. Calculate total cost of ownership, not unit price

This is the step most people skip. It's also the most expensive one. The $500 quote turned into $800 after shipping, setup, and revision fees. The $650 all-inclusive quote was actually cheaper.

What to do: List every cost: unit price, shipping, unloading, install/setup, rework allowance (5-10%), and time cost. Electrical adaptation for an electric fireplace Napoleon can run an extra $500-1,500 depending on local electrician rates (based on early 2025 ballparks; verify local pricing). You won't see any of this if you're staring at unit price alone.

4. Confirm electrical and gas requirements

Electric and gas fireplaces have completely different install requirements. I watched a contractor re-frame a wall for a gas fireplace vent—only to find out the client had ordered the electric version.

What to do: Before confirming the order, screenshot the "Electrical Requirements" or "Gas Requirements" page from the spec sheet and send it to the client. Don't just ask "do you have gas there?" over the phone. Have the client reply "confirmed" under the screenshot.

5. Verify that warranty coverage applies to commercial use

Napoleon residential and commercial warranties aren't the same. If you're ordering for a restaurant or hotel and you use a residential-warranty model, the client might not get full coverage.

What to do: Check the warranty page on Napoleon's site. Confirm the selected model's commercial-scenario coverage. If there's a commercial-rated alternative, offer it to the client upfront.

6. Match lead time to the project schedule

In Q2 2023, I confirmed a fireplace order without checking lead time. The factory ship date landed three weeks after the client's install date. The client didn't say much—but every follow-up order on that project went to another dealer.

What to do: Get an estimated ship date from your Napoleon rep before you confirm. Add 5-7 business days for unloading and local delivery. Put that date in the order confirmation email and send it to the client.

7. Check local code and clearance requirements

Different cities have different venting and clearance requirements for gas fireplaces. I hit this one in 2019. I haven't skipped it since.

What to do: Call the local building department and confirm requirements for that address. If the client has a GC, get written confirmation from the GC. Keep it on file.

8. Confirm unloading conditions and receiving contact

A $3,200 grill showed up at a job site where the only person on hand was the client's receptionist. The driver wouldn't unload. Rescheduling cost $180.

What to do: When ordering, confirm: is there a forklift or ramp on site? Will someone be there at the agreed time? If not, coordinate liftgate service through Napoleon logistics ahead of time. $75-150 is cheaper than a redelivery fee.

9. Set up an arrival inspection checklist

Not inspecting is the same as doing the first eight steps for nothing. My current arrival checklist has seven items: outer box condition, quantity, model label, accessory kit completeness, serial number record, photo documentation, and a power/gas test within 24 hours.

What to do: Print it and stick it in the receiving area. Write "received subject to inspection" on the delivery receipt before signing. Once you sign "in good condition," disputes get very hard to win.

10. Archive every communication

Emails, quotes, drawing markups, client confirmation screenshots—all of it. One folder per project. In 2024, I helped a client win a parts dispute with the factory using nothing but an email screenshot from 2023.

What to do: After every call, send a summary email. Three lines is fine: who's doing what, by when, for how much. If the client doesn't reply, that's fine—you still have the record.

11. Follow up with the client within 48 hours of delivery

Most people skip this one. But this is where repeat business comes from. If the client hits a small issue during install and you solve it within 48 hours, what they remember is "this person is reliable." Wait a week, and what they remember is "there was a problem."

What to do: Send a quick message within 48 hours: "Install going okay? All the parts there?" If they mention any issue—even a small one—call Napoleon tech support that same day.

A few reminders

This checklist isn't magic. This was accurate as of Q1 2025. The market moves fast—verify current lead times and pricing with your Napoleon rep.

The most common errors cluster around steps 3 and 6. Missed TCO line items and lead time misjudgments can eat an entire order's margin.

One last thing: don't place orders while distracted. My biggest single loss happened on an afternoon when I was also reconciling shower shoes inventory, confirming a hand and stone appointment for a colleague, and squeezing in a first draft of a cover letter for a job posting. Multitasking is expensive.

Warren Hughes
Warren Hughes

Warren Hughes is a building-envelope analyst specializing in windows, exterior doors, siding, cladding, architectural glass, curtain walls, storefronts, anchors, gaskets, and perimeter seals. He applies ASTM E283/E283M, ASTM E330/E330M, and ASTM E331 to their respective air-leakage, structural, and water-penetration evaluations while tracking pressure differential, deflection, leakage rate, drainage, glass make-up, and anchorage. His field-oriented guides help architects, façade contractors, and developers define mock-up tests, interface details, acceptance limits, and remedial priorities before enclosure closeout.